image

Established in 2003, Golden Tri Star (GTS) has been serving the society with the state-of-the art geo-engineering technology.

Having accomplished different projects such as Shwegyin Hydropower, Myanmar Economic Bank Project, Ayeyarwaddy River Crossing Tower Project, Yadanatheinga (Shwe Bo), Khan Bridge (Kachine State), Nyaung Done Bridge (Ayeyawaddy Division) and Pakkoku Bridge (the longest bridge in Myanmar) the company continues to provide customer satisfaction and safety.

The company brings its technical experience and operational expertise in tunnel construction and bore pilling projects providing comprehensive solutions and service in engineering, technology and construction areas. The recent construction of Hledan Flyover project for transportation and the iconic Ruby Hall are the proof of company’s desire for greater quality service to the nation.

It strives to expand its business and offers wide range of geotechnical engineering services including Press Pilling Work, Bridge Foundation (Bore Pile), Bore Pilling Work, Mini-bore Pilling Work, Retaining Wall Construction Work, Dam Foundation Work, Mining Work and Geotechnical Investigation.

Press Pilling Work

  • Building Foundation
  • Factory and Bridge Foundation
  • Bridge Foundation (Bore Pile)
  • Dohtawaddy Bridge (Thipaw)
  • Ayeyarwaddy Bridge(Yadanar Theinga)
  • Ayeyarwaddy Bridge (Sinkhan)
  • Ayeyarwaddy Bridge (Pakokku)
  • Ayeyarwaddy Bridge (nyaung Done)

Bore Pilling Work

  • High Tension Tower Foundation
  • High Rise Building Foundation
  • Jetty Foundation Mini-bore Pilling Work
  • Bridge and Building Foundation

Retaining Wall Construction Work

  • Cutoff secant pile wall for basement
  • Sheet pile construction Dam Foundation Work
  • Diaphragm wall construction
  • Drilling and Grouting

Mining Work

  • Blast Hole Drilling
  • Geotechnical Investigation Work
  • Soil Testing
  • Rock Coring and Investigation Drilling

 

The followings are the projects completed by GTS from 2003 to 2010:

River Crossing Tower Foundation (Bore Pile)

  • Ayeyarwaddy River Crossing (Kazintaw)
  • Ayeyarwaddy River Crossing (Sagaing&Tadaoo)
  • Sittaung River Crossing (Shwekyin)
  • Hlaing River Crossing (Bayintnaung)Hydraulic Pressure Static Pile Work
  • Shop House complex(Nay Pyi Taw)
  • Ruby Tower Project(Yangon)
  • FFSS Project (North Dagon)
  • Kanbawza Bank (Sanchaung)
  • Shop House Project (Junction Square)

Driven Pile Work

  • Myanmar Economic Bank Project (Nay Pyi Taw)
  • Malikha Housing Project(Yangon)
  • National Landmark Project(Nay Pyi Taw)
  • Hlaingtharyar-Ahlone Transmission Line Project Mini-bore Pile Work
  • HlaingtharyarBayintnaung Transmission Line Project
  • Hlaing River Crossing Project (Htantabin)
  • Steel Factory Project(Taunggyi)
  • Cyclone Shelter Project(Toeywa)